top of page

HARTFORD HOSPITAL SUBSTATION

10,000

Square Footage

Healthcare/Medical

Market Served

HARTFORD HOSPITAL

Owner Name

Demolition of existing gear and installation of a new 11kV substation.


SPECIFIC CHALLENGES: Installing GRC throughout the existing hospital tunnels was challenging due to the very limited space. In addition, rigging and setting (2) 75,000-pound substations required extensive planning to ensure each unit fit safely within the available footprint. Integration system controls needed to be modified and coordinated with the utility.

bottom of page